Successful coorperation with thyssenkrupp


The Tech-Center Control Technology of the thyssenkrupp AG assigned Computer Science 7 to analyze the optimal dispatch of a cement plant by a combined optimization and simulation model. Mainly cost reduction potentials should be determined by optimizing the cement production considering the integration of storage within the whole production process. Furthermore, a redox-flow batterie and a wind powerplant were added to the cement plant in order to determine possible cost savings by reducing the grid power supply on the one hand and beeing able to offer frequency restoration reserve power on the other hand. The results showed that a significant decrease of electricity supply cost per produced ton cement is possible under certain conditions.

For more detailed information please take a look at the paper presented at the Energieinformatik 2016 conference and the article in the technology magazine techforum published by thyssenkrupp AG.